1KfW funded Middle Marsyangdi Hydroelectric Project (70 MW)Lamjung districtNEA2008-12-00<p> Monitoring and mitigation plan during construction</p>
2IEE Study of Rural Electrification Schemes (Package 3)Gulmi, Myagdi, Gorkha, Baglung&ArghakhanchidistrictsNEA2003-07-00<p> Initial environmental examination</p>
3KfW funded EIA of LMHEP – MMHEP 132 kV Transmission Line under 70 MW Middle Marsyangdi Hydroelectric ProjectLamjung districtNEA2004-00-00<p> EIA study, analysis, public consultation, EMAP preparation</p>
4ADB funded Middle Marsyangdi Hydroelectric Project and Transmission Line (Stage 1)Lamjung districtNEA2001-10-00<p> Review, identification, scoping of environmental issues, preparation of scoping document/ToR/EIA report, field studies, generation of baseline quantitative data</p>
5IEE Study of Kabeli Corridor 132 kV Transmission Line ProjectJhapa, Ilam&Panchthar of Mechi Zone and TerhathumNepal Electricity Authority (NEA)2010-05-00<p> Field surveys for IEE study</p>
6Blood Transfusion Service Centre Building (area: 790 sq.m.)PradarshaniMarga, KathmanduNepal Red Cross Society (NRCS)2012-02-00<p> Detailed survey, architectural &amp; engineering design, drawings, tender documents, estimation and costing</p>
7ADB funded Public Environment Education and Staff Training under ADB funded STIDP, PEIPPokhara, Kaski districtPokhara Sub-metropolis2000-09-00<p> Design &amp; develop a community education campaign/ training program, conduct community meetings, educate people</p>
8ADB funded District Education Office Building Construction Project (area: 740 GSM)Dandagaun, Bhojpur districtPrimary Education Development Project/ GoN1999-06-00<p> Survey, master-planning, design of building and other physical facilities,</p> <p> supervision of construction works</p>
9Dipayal- Patihalne District Road, Daud- Patihalne Section (Package B)Doti districtRAP2004-02-00<p> Alignment selection, detail survey and design</p>
10DFID funded Hile- Bhojpur Feeder Road Project (92.5 km)Dhankuta and Bhojpur districtsRAP &DoR2008-08-00<p> Survey, investigation, detailed engineering, construction supervision</p>