Completed Projects

Displaying 71-80 of 85 results.
S.N.TitleLocationClientCompletion YearDescription
1Bridge (60 m) over Kaligandaki RiverMyagdi districtDoR2007-12-00<p> Feasibility study, detailed survey, soil investigation &amp; engineering design</p>
2Bridge (60m) over Marsyangdi RiverBhoteodar, Lamjung districtDoR2007-11-00<p> &quot;&quot;&quot;</p>
3Check Design and Construction Supervision for Tunnel Works (360 m long)Guheshwori, KathmanduBASP2001-00-00<p> Finalization of working drawings, construction supervision and quality assurance.</p>
4Manahara River Bridge along Sinamangal–Sanothimi Road (RCC - 60 m length & 3 span)KathmanduDoR1999-07-00<p> Study, drilling, soil investigation, survey, detailed design</p>
5Bagmati River Bridge along Jorpati- Gothatar Road, Kathmandu (RCC - 50 m length & 3 span)KathmanduDoR1999-07-00<p> Study, drilling, soil investigation, survey, detailed design</p>
6Kamadehi River Bridge along JigadwaBelbichhawa-Jetharahiya Road, Rautahat (RCC -25m length span)KathmanduDoR1999-07-00<p> Study, drilling, soil investigation, survey, detailed design</p>
7IEE Study of Kabeli Corridor 132 kV Transmission Line ProjectJhapa, Ilam&Panchthar of Mechi Zone and TerhathumNepal Electricity Authority (NEA)2010-05-00<p> Field surveys for IEE study</p>
8KfW funded Middle Marsyangdi Hydroelectric Project (70 MW)Lamjung districtNEA2008-12-00<p> Monitoring and mitigation plan during construction</p>
9IEE Study of Rural Electrification Schemes (Package 3)Gulmi, Myagdi, Gorkha, Baglung&ArghakhanchidistrictsNEA2003-07-00<p> Initial environmental examination</p>
10KfW funded EIA of LMHEP – MMHEP 132 kV Transmission Line under 70 MW Middle Marsyangdi Hydroelectric ProjectLamjung districtNEA2004-00-00<p> EIA study, analysis, public consultation, EMAP preparation</p>